Pakistan’s electricity sector has evolved into a structural constraint on growth, fiscal stability, and external balance. The system operates approximately 49,651 MW of installed capacity against annual consumption of only ≈120–130 TWh, resulting in chronic underutilization. Fixed capacity payment obligations exceed PKR 1.8 trillion a year and must be recovered regardless of how much electricity is actually consumed. This has pushed the average Power Purchase Price to ≈PKR 23.37/kWh derived from an Energy Purchase Price of PKR 1,149 billion and a Capacity Purchase Price of PKR 1,807 billion for roughly 126.5 TWh procured with end-consumer tariffs (basket price ≈PKR 34.01/kWh) running considerably higher once distribution margins, transmission charges, taxes, and surcharges are added. The result is a power sector that burdens the economy rather than enabling it.

The sector is caught in a utility death spiral that simultaneously erodes demand and inflates cost. High tariffs are driving industrial and commercial consumers off the grid toward captive generation, solarization, and diesel alternatives. Every consumer who exits reduces the volume over which fixed capacity costs are spread, pushing per-unit tariffs higher still and accelerating further defection a self-reinforcing cycle now deeply embedded in the system.

The core constraint is insufficient productive demand, not insufficient supply. Because the system carries surplus capacity, its economics are governed by a denominator effect: growing electricity demand, particularly from productive sectors, spreads fixed capacity payments over a larger base and lowers the average cost per unit. This reframes the policy priority from adding supply to expanding demand as the primary lever for restoring affordability.

Electrification as the Primary Growth Lever

The report identifies electrification across five domains transport, industry and commerce, households, agriculture and cold chain, and digital infrastructure as the most immediate, structurally sound pathway to expand grid demand while displacing imported fuels. Aggregated across sectors, the additive technical potential exceeds 140 TWh of new demand, more than doubling current consumption. Under a full-realization case, average system cost falls to approximately PKR 14–16/kWh, a reduction of over 30 percent driven by improved utilization of existing capacity.

Summary of Proposed Interventions

The report sets out a coordinated, three-phase intervention programme, sequenced so that low-cost regulatory measures create the institutional conditions for larger capital-intensive electrification, which in turn is reinforced by structural and financial reform of the cost base itself.

Phase 1 — No-Cost and Low-Cost Interventions (Immediate)

Eight regulatory and governance measures requiring no new generation or transmission investment can be initiated immediately through notifications and directives:

  • DISCO connection process reform and transformer-upgrade streamlining to clear the 1,021 MW+ connection backlog
  • EV and charging-infrastructure policy facilitation
  • Net metering optimization to better align solar-plus-electric load
  • DISCO governance and AT&C loss-reduction enforcement
  • Appliance MEPS standards and consumer awareness campaigns
  • Time-of-use pricing to unlock off-peak and shoulder demand
  • Structured grid integration of industrial captive BESS and solar
  • Public infrastructure and street-lighting electrification

Combined, conservative implementation of these eight measures is projected to add approximately 8,500–9,300 GWh of annual demand (≈7.4% of FY25 grid purchase volume), cutting the average bulk purchase cost from PKR 23.37 to approximately PKR 22.5–22.7/kWh and delivering PKR 87–114 billion in annual consumer savings without public capital investment.

Phase 2 — Sectoral Electrification (Medium Term)

Capital-intensive electrification across five demand-side sectors is enabled once Phase 1 institutional barriers are removed:

  • Transport — 5,000 electric buses in Punjab, EV adoption under the NEV Policy, and Pakistan Railways ML-1 electrification
  • Industry & commerce — gas-to-grid conversion of thermal loads, the largest single structural demand opportunity
  • Households — substitution of gas and LPG appliances with electric equivalents
  • Agriculture & cold chain — solarization of diesel tubewells and cold-storage expansion
  • Digital infrastructure — data-center development and telecom tower de-dieselization

Aggregated additively, technical potential across these sectors exceeds 140 TWh, but accounting for phased adoption, overlapping demand, and infrastructure constraints, the realistic medium-term expansion is 50–70 TWh (≈40–50% of technical potential), sufficient to cut industrial tariffs by 15–27 percent.

Phase 3 — Financial and Structural Reform (Enabling)

Reducing the fixed cost base itself, in parallel with demand growth:

  • Capacity payment restructuring — reclassifying CPEC coal payments as sovereign debt and shifting low-utilization plants to performance-based payments; estimated PKR 3–5/kWh reduction
  • Subsidy redirection — reallocating up to PKR 600 billion toward capacity payment relief
  • Cross-subsidy elimination and tariff rationalization — estimated PKR 96–181 billion annual savings for industry and commerce
  • NEPRA regulatory reform toward output-based regulation and faster tariff adjustments
  • DISCO privatization and franchising of high-loss zones, with microgrid substitution to eliminate energy theft
  • Circular debt governance through ring-fenced DISCO revenues, automated settlement, and multi-year tariff frameworks
  • Concessional and climate finance (Green Climate Fund, ADB Energy Transformation Facility, IFC guarantees) to lower the capital cost of grid modernization, BESS, and microgrids

Key Results

The integrated scenario model translates these interventions into four system-level outcomes, benchmarked against the FY25 baseline of 126 TWh demand and PKR 23.37/kWh average cost:

Scenario Demand (TWh) Avg Cost (PKR/kWh) Export Impact GDP Growth Circular Debt
Status Quo 122 25.40 –$1 bn –0.3 to –0.5 pp Deteriorates
Partial Recovery 142 21.30 +$1–2 bn +0.5 pp Stabilizes
Integrated 162 18.30 +$3–5 bn +1.0–1.4 pp Improves
Transformation 187 15.70 +$6–7 bn +2.0 pp Reduces materially

The Integrated scenario the report’s central, policy-relevant case, corresponding to the 50–70 TWh realistic demand expansion raises electricity demand to 162 TWh and cuts average cost to PKR 18.3/kWh, a reduction of roughly 22 percent from baseline, while improving exports by $3–5 billion and GDP growth by 1.0–1.4 percentage points. The Transformation scenario represents the technical upper bound of full sectoral realization:

Full-Realization (Transformation) Outcomes

  • Industrial tariff reduction of 19–26 percent
  • Export gains of $7–9 billion
  • Net foreign exchange improvement of $10–14 billion
  • GDP growth uplift of 0–2.5 percentage points
  • Inflation reduction of 8–2.8 percentage points
  • Circular debt improvement of PKR 0.9–1.3 trillion
  • Displacement of 5–4.5 billion litres of petrol/diesel and 3.21 billion litres of diesel via tubewell solarization, plus reduced reliance on 1,351 MMCFD of gas and 2.8 million tonnes of LPG
  • Annual carbon emissions reduction of 8–12 million tonnes CO₂e

A Self-Reinforcing Cycle

Together, these measures create a virtuous cycle: as demand rises, average costs fall; as costs fall, tariffs decline; as tariffs decline, more consumers reconnect to the grid, further raising demand. This reverses the present dynamic of shrinking demand and rising cost, replacing the downward spiral with an upward cycle of expanding consumption and improving affordability provided reforms are implemented with coherence and commitment.

Conclusion

Pakistan’s power sector can be transformed from a fiscal liability into a strategic asset for economic growth. Its existing surplus capacity, currently underutilized and financially burdensome, represents an opportunity to support industrialization, expand exports, and attract investment. The policy imperative is to align electrification, cost reform, and institutional restructuring within a single coherent strategy: fragmented or partial reforms will not break the current equilibrium. Pakistan stands at a critical inflection point continued inaction deepens the cycle of high cost and declining demand, while a decisive, integrated electrification strategy offers a credible path to lower tariffs, stronger external balances, improved fiscal outcomes, and sustained economic growth.

The PBC is a private sector not-for-profit advocacy platform set-up in 2005 by 14 (now 100+) of Pakistan’s largest businesses. PBC’s research-based advocacy supports measures which improve Pakistani industry’s regional and global competitiveness. More information about the PBC, its members, objectives and activities can be found on its website: www.pbc.org.pk